SEGMENTAL WALL MATERIAL ESTIMATOR

Retaining Wall Calculator

Estimate blocks, buried courses, caps, base aggregate, drainage rock, backfill, bags, and material cost.

Calculates locally in your browser
Updated September 11, 2026Block retaining wallsUS & metric inputs

WALL SIZE

Enter the finished wall

Measurement system
ft
ft

BLOCK & CAP SIZE

in
in
%
in
%
$
$
Base, drainage rock, and backfill
in
in
in
ft
cu ft
$/ cu yd
$/ cu yd

These are planning dimensions only. Use the approved wall design and exact block-system requirements for embedment, base, drainage, backfill, and reinforcement.

ADVERTISEMENT

CALCULATION METHOD

How many retaining wall blocks do I need?

Divide wall length by block face length to find blocks per course. Divide exposed height by block face height and round up, then add buried courses. Multiply blocks per course by total courses and add the selected cutting allowance.

Blocks per course = wall length ÷ block face length, rounded up

Total courses = exposed height ÷ block height, rounded up + buried courses

Order blocks = blocks per course × total courses × (1 + waste)

Cap blocks = wall length ÷ cap coverage × (1 + cap waste)

20 × 3 ft retaining wall example

A 20 ft wall using 16 × 6 in block needs 15 blocks per course. A 3 ft exposed height is six courses; adding one buried course makes seven. That is 105 installed positions, or 111 blocks after a 5% allowance. Twelve-inch cap coverage requires 21 caps after 5% extra.

Retaining wall block calculator

Use the exact block’s face dimensions rather than nominal package names. Curves, corners, steps, grade changes, partial courses, columns, and pattern walls require additional units beyond a simple rectangular estimate.

Retaining wall gravel calculator

Base aggregate is calculated from trench length, width, and compacted depth, then multiplied by the loose aggregate factor. Drainage rock is estimated as a rectangular zone behind the exposed wall. Blocks with open cores can require additional aggregate not included here.

Backfill and drainage

The additional backfill field gives a simple rectangular planning volume beyond the drainage-rock zone. Real backfill follows the cut slope and engineered reinforcement zone, so approved plans take priority. Drainpipe, outlets, filter fabric, and water management are not quantified.

Retaining wall cost calculator

The material total includes blocks, caps, bulk base aggregate, bulk drainage rock, and optional backfill soil using the entered prices. It excludes labor, excavation, delivery, tax, adhesive, drainpipe, geotextile, geogrid, equipment, disposal, permits, and engineering.

Method references

Allan Block’s material estimation worksheet for blocks per course, courses, buried units, 5% extra, and aggregate planning; The Home Depot retaining wall guide for block-course estimating, embedment, drainage, and extra material; Belgard installation guidance for drainage aggregate and site-specific design. Accessed September 11, 2026.

COMMON QUESTIONS

Retaining wall calculator FAQs

How many retaining wall blocks do I need for a 20 ft wall?

It depends on block face length and the number of courses. A 20 ft course uses 15 nominal 16-inch blocks. Multiply by all exposed and buried courses, then add cutting and breakage allowance.

Should the buried course count as blocks?

Yes. Buried blocks are still purchased and installed, so this calculator adds the selected buried courses to the visible courses.

How much gravel goes behind a retaining wall?

The calculator uses the entered drainage-zone width and exposed wall dimensions. Manufacturer guidance commonly calls for a free-draining aggregate zone, but exact width, core fill, and drainage design depend on the system and approved plan.

Does this calculator estimate geogrid?

No. Geogrid type, length, spacing, and embedment depend on wall height, soil, slope, water, surcharge loads, block system, and engineering requirements.

Can I use this estimate for a tall retaining wall?

Use it only for preliminary material planning. Tall walls and difficult sites require project-specific code, permit, manufacturer, and engineering review before construction.